Üks küsimus - kuhu siin mahub veel Eesti Kultuurikeskus? (7)
Eestlased Kanadas | 02 Dec 2017  | EWR OnlineEWR


Urban Toronto's Facebook Page Urban Toronto's Twitter Feed Urban Toronto on Instagram
Public Engagement Sought as 300 Bloor West Proposal Evolves
November 2, 2017 1:40 pm | by Nathan Petryshyn | 6 Comments

Public consultations have begun for a proposed mixed-use redevelopment at 300 Bloor Street West, along the southern edge of Toronto's Annex neighbourhood. Home to Bloor Street United Church, Northrop Developments Inc has engaged KPMB Architects and ERA Architects to design a 38-storey mixed-use tower along with renovations to and restoration of the historic church space with a “space-between” style connection to the commercial and residential high-rise.

Article: http://urbantoronto.ca/news/20...
 

Viimased kommentaarid

Kommentaarid on kirjutatud EWR lugejate poolt. Nende sisu ei pruugi ühtida EWR toimetuse seisukohtadega.
balance of power08 Dec 2017 15:30
"The situation we’re dealing with is an appeal a day,” said Councillor Joe Cressy":

https://www.thestar.com/news/c...
Requirement05 Dec 2017 17:26
60 parking spaces MINIMUM
I don't get it05 Dec 2017 06:39
I don't get it. Why was not our Madison project board not able to secure a tower and these guys could? It's the next street over. Is it a scenario of too green players unable to elbow space for themselves in the "big boy's" sandbox?

I don't buy it that we would not have been able to build over the subway. Look at Union Station.

Seems like the communities we reside in (or want to reside in) have the upper hand with opposing wishes.

I think we can still make a go of it with the support of the surrounding Broadview community to redesign our centre. They should be forthcoming going forward since they fear the developers swooping in to buy the property and building a monstrosity.

Loe kõiki kommentaare (7)

Eestlased Kanadas